- 10 ,210 m2 or 110,000 ft2 total area.
- 40,000 m3 of excavated material.
- 9,600 m3 of preload material for area B.
- 5,000 plus m3 concrete volume.
- 2 million pounds or 909,090.91 kg of structural steel tonnage for super structure frame.
- 1,500 G or 5,700 L of paint.
- 200 rolls of marmoleum floor covering.
- 36,400 kg or 80,000 pounds of exterior metal wall cladding.
- Three B trains of roofing material.
- Over 1,000,000 ft2 or 92,903 m2 of drywall.
- Over 250,000 person days of labour.
- 120 lifts of interior finishing material including birch and MDF.
- 6,000 linear feet of reclaimed fir for floor base board (or 1,830 linear meters).