Include Enable Connect: A framework for maximizing social impact through design. Discover the book

Reimagine Kitsilano Pool feasibility study

Kitsilano Pool has been a summertime fixture in Vancouver for generations. But aging infrastructure and sea-level rise associated with climate change now threaten its future.

The City of Vancouver and the Vancouver Board of Parks and Recreation engaged hcma to lead the Reimagine Kitsilano Pool study, exploring how this beloved waterfront destination can continue serving future generations amid evolving community needs and increasing climate pressures.

The study aimed to establish a transparent decision-making process while envisioning a welcoming, accessible, and resilient future for the site. Objectives included evaluating renewal and replacement options, balancing priorities such as reconciliation, climate adaptation, environmental stewardship, and community needs, and identifying the technical and operational requirements that will shape future investment decisions.

A landmark at a turning point

The first Kitsilano Pool opened in 1931, with the current facility constructed on the same site in 1979. Today, it remains a one-of-a-kind destination, featuring a 137.5-metre saltwater pool—the longest public swimming pool in North America. Its setting, framed by Kitsilano Beach, English Bay, and the North Shore Mountains, has made it a defining part of Vancouver summers for decades.

Yet its iconic waterfront location is also what makes Kits Pool increasingly vulnerable. In 2022, a king tide and storm surge flooded the pool and surrounding park, highlighting the realities of climate change and sea-level rise. In addition, the facility itself has reached the end of its service life after nearly 50 years of operation.

A city-wide conversation

As part of the feasibility study, the City of Vancouver and the Vancouver Board of Parks and Recreation connected with community members. This process included multilingual public consultation, user group workshops, and targeted stakeholder sessions, yielding feedback from over 10,000 individuals on what they wanted to see for the future of Kits Pool.

Community input revealed four clear priorities: preserving the pool’s defining features, from its exceptional length to its connection with the surrounding landscape; enhancing comfort and usability through the addition of shaded lounging areas and other deck improvements; supporting inclusive access; and preparing the facility for a more resilient future as well as extended seasonal use.

Meaningful access: hcma's Persons with Lived Experience team

Community feedback underscored strong support for a future facility that offers significantly more inclusive access than the current pool.

To better understand existing barriers, hcma's Persons with Lived Experience (PwLE) team conducted a comprehensive accessibility assessment of Kitsilano Pool. The team includes individuals with lived experience of mobility, dexterity, chronic pain, vision, hearing, and cognitive disabilities, as well as neurodivergence. Their evaluation examined the entire user journey, from accessing information online before arrival to navigating the site, pool deck, aquatic spaces, change rooms, washrooms, and wayfinding systems.

The assessment identified several opportunities to improve accessibility across the facility, including clearer wayfinding and signage, increased shading, additional handrails, better storage, and universal design measures.

Recommendations focused on making the pool easier to navigate, more comfortable to use, and more responsive to diverse needs. Proposed measures included visual and tactile wayfinding cues, enhanced signage, visual announcements, increased shade to reduce glare, quieter swimming periods, and private universal washrooms with integrated storage for mobility devices.

The three options presented

Drawing on our technical analysis, environmental studies, operational assessments, and public input, the study developed three potential paths forward for consideration by Council and the Park Board:

  • Protect the existing facility
  • Renovate the existing facility
  • Replace the facility outside the floodplain

Each option reflects a different balance of investment, resilience, and long-term service delivery. Shared across all three is a naturalized beach and rocky breakwater that would enhance shoreline ecology while helping protect the site from future flooding.

The full replacement option represents the most comprehensive transformation. It reimagines the facility with separate leisure and lap pools, new support buildings, enhanced accessibility, an expanded public realm featuring a splash pad, community stage, and concession, and opportunities for expanded aquatic programming.

What's next

This feasibility study represents the first step in charting a path forward for Kitsilano Pool. Future investment in the facility will be considered through the City’s 2027–2030 Capital Plan, alongside broader priorities related to climate resilience, infrastructure renewal, and reconciliation.

Other Projects